Mumbai’s Elphinstone Road Over Bridge (ROB) is closed from 25th April for two years for demolition and reconstruction as part of the Sewri-Worli Elevated Connector project.
The bridge connects Parel and Prabhadevi, and its closure will cause traffic disruptions and diversions in nearby areas such as Dadar, Lower Parel, Curry Road, and Bharatmata Junction.
The 100-year-old bridge will be replaced with a modern double-decker structure to ease congestion and improve east-west traffic flow.
The new bridge will have two levels: one for a 2+2 lane carriageway and the second for a 2+2 lane stretch connecting the Mumbai Trans Harbour Link to the Bandra-Worli Sea Link.
The larger Sewri-Worli Elevated Connector project, which spans 4.5 km, will connect key roads, offering a seamless corridor that reduces travel time and provides signal-free access between central and south Mumbai.
Got Stocks-Related Questions? The Analyst is Ready.
Unlock profitable opportunities every day! Unicorn Signals provides actionable intraday trading signals for stocks and futures. Don’t miss out – download Unicorn Signals and start winning now!